Aquatic refurbishment and upgrades
We design remedial works and upgrades for existing pools: shell repairs, new linings, plant replacement, conversion to wet-deck, accessible entry and refurbishment to current requirements. The design aims to extend the facility's life at a lower cost than replacement.
Aquatic engineering
Typical projects
- Concrete repair and relining of leaking pools
- Plant room and filtration upgrades
- Conversion from skimmer to wet-deck
- Adding ramps, stairs or hoists for access
- Residential pool renovations and reshaping
Problems this work solves
- Working with what is there
- The existing shell, pipework and plant room set limits on what can change. Surveying the existing facility first prevents designs that cannot be built.
- Shutdown windows
- Commercial pools can rarely close for long. Works are staged and sequenced to the operator's shutdown window.
- Reinforcement corrosion
- Spalling concrete usually means corroding steel. A lasting repair removes the corrosion and restores cover to the bars.
What our engineering covers
Coreline's role is design, documentation, assessment and inspection. Construction, supply and installation sit with the builder and trades.
- Survey and investigation of the existing facility
- Remedial design for shell, joints, concourse and gutters
- Plant and hydraulic upgrade design
- Accessible entry design
- Staging and shutdown planning with the operator
- Inspection during works
Design considerations
- Repair life against cost
- A patch repair is cheap now but may last a few years; a full reline costs more and lasts longer. The report sets out both so the owner can decide.
- Upgrade triggers
- Major works can trigger requirements to bring other parts of a facility up to current standards. The certifier's view on this should be sought early.
- Energy savings
- Variable speed pumps, better pipework and heat retention often pay for themselves in operating savings, which helps justify the capital spend.
What you typically receive
The exact deliverables are set in the fee proposal for each project.
- Remedial and upgrade drawings and specification
- Staging plan
- Certification for building approval where required
- Inspection reports during works
What to send us
- Existing drawings and any previous reports
- Description of problems and their history
- Shutdown windows available
- Budget range
- Water quality and plant records
Standards and regulations that usually apply
Which documents govern a design depends on the project. These are the ones most often relevant here; we confirm the applicable editions for each job.
- AS 3600
- Design and construction of reinforced and prestressed concrete structures and members.
- AS 3735
- Concrete structures that retain liquid, covering crack control, cover and watertightness.
- AS 1428.1
- Design for access and mobility, referenced by the NCC for accessible paths and entries.
- NCC (Building Code of Australia)
- Performance requirements for buildings. In Queensland NCC 2022 applies until 30 April 2027 and NCC 2025 from 1 May 2027.
Questions we are asked
Is it cheaper to refurbish an old pool or build a new one?
Refurbishment is usually cheaper where the shell is structurally sound, but not always. An assessment of the shell and plant tells you which parts are worth keeping before committing to either path.
Can a skimmer pool be converted to wet-deck?
Often yes, but it means new gutters, a balance tank and changes to the pipework. Whether it is worth doing depends on the bather load and water quality problems the pool has today.
Can work be done while the pool stays open?
Some plant work can be done with the pool open. Shell and gutter repairs need the pool drained, so we stage the works around the operator's shutdown windows.
Need aquatic refurbishment and upgrades?
Tell us what you are building or assessing, where it is and what drawings or reports you already have. We will come back with questions, a scope and a fee.
- Phone
- 1300 924 666
- Registered engineer
- Mustafa Koc, RPEQ 35981 (Civil)
