Precast and tilt-up concrete
We design precast and tilt-up concrete panel structures, including panel reinforcement, connections to the frame and slab, and the temporary stability of panels during erection. The work suits warehouses, distribution centres, retail buildings and multi-residential walls.
Structural engineering
Typical projects
- Tilt-up warehouses and distribution centres
- Precast wall panels for retail and commercial buildings
- Precast walls in multi-residential and mid-rise projects
- Precast retaining and boundary walls
Problems this work solves
- Lifting and handling governs the panel
- A tilt-up panel often sees its highest stresses while it is being lifted off the casting bed, not once it is in the building. Lifting insert positions and reinforcement have to be designed for that stage.
- Temporary bracing
- Panels stand on temporary braces until the roof and floors tie them together. Brace design and the sequence of removing them are part of the engineering, and failures happen in this window.
- Connection tolerance
- Precast elements are made to tight tolerances but sit on in-situ work that is not. Connections need adjustment built in, or the site crew ends up cutting and welding to make them fit.
What our engineering covers
Coreline's role is design, documentation, assessment and inspection. Construction, supply and installation sit with the builder and trades.
- Panel layout, joint positions and structural role of each panel
- Panel reinforcement and connection design
- Design of panel-to-slab, panel-to-frame and panel-to-panel connections
- Erection-stage stability and bracing requirements
- Coordination with the precaster's shop drawings and lifting design
- Inspection of panels and connections where engaged
Design considerations
- Tilt-up against factory precast
- Tilt-up casts panels on the building slab, which saves transport but needs slab area and crane access. Factory precast gives better finish control and frees the site, at the cost of transport and larger crane picks.
- Fire and acoustic role
- Panels often double as fire walls or acoustic separation, which fixes minimum thickness and joint details regardless of structural need.
- Openings near edges
- Doors and windows close to panel edges or lifting points weaken the panel during lifting. Moving an opening by a few hundred millimetres can avoid extra reinforcement.
What you typically receive
The exact deliverables are set in the fee proposal for each project.
- Panel layout and elevation drawings
- Panel reinforcement and connection details
- Erection and temporary bracing requirements
- Shop drawing review comments
- Design certification for building approval where required
What to send us
- Architectural plans and elevations showing openings
- Preferred method: site-cast tilt-up or factory precast
- Crane access and site constraints
- Geotechnical report for the floor slab and footings
- Fire and acoustic requirements from the building certifier or consultants
Standards and regulations that usually apply
Which documents govern a design depends on the project. These are the ones most often relevant here; we confirm the applicable editions for each job.
- AS 3600
- Design and construction of reinforced and prestressed concrete structures and members.
- AS/NZS 1170 series
- Structural design actions: permanent, imposed, wind, earthquake and other loads used in every structural design.
- NCC (Building Code of Australia)
- Performance requirements for buildings. In Queensland NCC 2022 applies until 30 April 2027 and NCC 2025 from 1 May 2027.
Questions we are asked
Is tilt-up cheaper than steel cladding for a warehouse?
It can be, particularly where the walls also need fire separation, security or impact resistance, because one panel provides structure and finish together. On smaller buildings with no fire wall requirement, a steel frame with metal cladding is often cheaper.
Who designs the lifting inserts in a precast panel?
The precaster or a specialist lifting designer usually designs the lifting system, working from the structural engineer's panel design. We coordinate the two so the panel reinforcement and the lifting points suit each other.
How long do tilt-up panels need to stay braced?
Until the permanent structure that stabilises them, typically the roof or a floor diaphragm, is complete and connected. The structural drawings should state when braces may be removed, and they should not come off earlier.
Sources
Need precast and tilt-up concrete?
Tell us what you are building or assessing, where it is and what drawings or reports you already have. We will come back with questions, a scope and a fee.
- Phone
- 1300 924 666
- Registered engineer
- Mustafa Koc, RPEQ 35981 (Civil)