Structural steel design
We design steel frames, portal frames, mezzanines, canopies, platforms and connections for commercial and industrial buildings and alterations. Designs are prepared to AS 4100 and documented so the fabricator can detail shop drawings with minimal back and forth.
Structural engineering
Typical projects
- Portal frame warehouses, workshops and farm buildings
- Mezzanine floors and access platforms in existing buildings
- Canopies, awnings and entry structures
- Steel-framed commercial and retail buildings
- Supports for plant, tanks and conveyors
Problems this work solves
- Connections left to the fabricator
- Member sizes on a drawing mean little if the connections are undesigned. Unclear connection design is a common cause of fabrication delays and site rework.
- Wind on large roofs
- In south-east Queensland, uplift on large roofs and open-sided structures often governs the frame, the purlins and the hold-down bolts more than gravity loads do.
- Bracing that clashes with use
- Cross bracing in the wrong bay blocks a roller door or a forklift route. Bracing locations need to be agreed with the operator before the frame is finalised.
What our engineering covers
Coreline's role is design, documentation, assessment and inspection. Construction, supply and installation sit with the builder and trades.
- Frame layout and bracing strategy agreed with the architect or owner
- Member and connection design to AS 4100 under AS/NZS 1170 wind and imposed loads
- Hold-down, baseplate and footing interface design
- Drawings with member schedules and connection details for fabrication
- Shop drawing review
- Assessment of existing steel structures for added loads or modifications
Design considerations
- Weight against fabrication effort
- The lightest frame is not always the cheapest. Repeating sections and simple bolted connections can cost less overall than a frame optimised member by member.
- Corrosion protection
- Coastal sites, farm sheds with livestock and processing plants with washdown need a coating system chosen for that exposure, which affects both cost and maintenance.
- Fire and occupancy
- The building class and fire separation requirements can change whether steel needs protection. That is resolved with the building certifier and fire engineer early.
What you typically receive
The exact deliverables are set in the fee proposal for each project.
- Structural steel drawings with member schedules and connection details
- Footing and hold-down bolt details
- Design certification for building approval where required
- Shop drawing review comments
- Inspection certificates for inspections we carry out
What to send us
- Architectural drawings or a sketch of the structure with key dimensions
- Site address, so we can establish the wind region and terrain
- Intended use, including any cranes, plant, racking or vehicle loads
- Soil test or geotechnical report for the footings
- For alterations: existing drawings and photos of the current structure
Standards and regulations that usually apply
Which documents govern a design depends on the project. These are the ones most often relevant here; we confirm the applicable editions for each job.
- AS 4100
- Design of steel structures and the engineering aspects of fabrication, erection and modification.
- AS/NZS 1170 series
- Structural design actions: permanent, imposed, wind, earthquake and other loads used in every structural design.
- NCC (Building Code of Australia)
- Performance requirements for buildings. In Queensland NCC 2022 applies until 30 April 2027 and NCC 2025 from 1 May 2027.
Questions we are asked
Do I need an engineer to add a mezzanine to an existing warehouse?
Yes. A mezzanine adds load to the existing slab and sometimes to the building frame, and it needs building approval. The engineer designs the mezzanine and checks that the slab under each column can carry the point load.
Why does wind govern so many steel buildings in Queensland?
Large, light roofs and open sides catch wind uplift that can exceed the downward weight of the roof. The wind region, terrain and how open the building is set the design pressures, which then drive purlin spacing, frame size and hold-down bolts.
Do you design the connections or leave them to the fabricator?
We design and detail the connections on our drawings unless the contract assigns connection design to the fabricator. Either way the arrangement should be clear before tender, because it changes the fabricator's price.
Sources
Need structural steel design?
Tell us what you are building or assessing, where it is and what drawings or reports you already have. We will come back with questions, a scope and a fee.
- Phone
- 1300 924 666
- Registered engineer
- Mustafa Koc, RPEQ 35981 (Civil)
